Village of Shorewood · Milwaukee County, WI

House painting in Shorewood.

Interior, exterior, cabinet and fence painting in a village where half the housing units date from 1939 or earlier and nearly two in three are in duplexes, apartment buildings or attached homes. This page covers the village’s design review, its permit for National Register buildings, its weekday work hours and the weather between the lake and the river. Bonded and insured, done by the owner and his own employees, with a written workmanship warranty.

  • Bonded & insured
  • Free, no-pressure estimates
  • Written warranty up to 10 years
Estimate request

Request an estimate in Shorewood

We’ll call or email to set a time.

Your details are kept private and used only to reach you about your project — we never share your info.

Our services

Shorewood homes

Half of Shorewood’s homes date from 1939 or earlier

The Census Bureau’s American Community Survey (2020–2024) counts 6,887 housing units in Shorewood, on 1.59 square miles of land. 50.9% were built in 1939 or earlier, which puts the median year built in the survey’s earliest bracket, and 72.5% before 1960. Of the decades since the 1950s, the 2010s have the largest share of today’s units: 8.5% date from 2010 to 2019.

Detached houses are the minority, at 35.8% of units. Two-unit buildings hold 16.7%, buildings of 20 to 49 units 10.3% and buildings of 50 or more 15.8%, and renters occupy more homes than owners, who live in 45.6% of occupied units. For a duplex, tell us whether the upper and lower are both in the job and who lives in each, so access and work days can be agreed with tenants; in a condominium, exterior color may be the association’s decision, so start there.

The Census decades do not split at 1978, the year Wisconsin’s lead-safe rule turns on, so the share of owner-occupied homes it can reach is a bracket: between 88.3% (built before 1970) and 90.4% (built before 1980).

Village history

A suburb that filled up in the 1920s, between the lake and the river

Shorewood began as the Village of East Milwaukee, incorporated in 1900 on roughly 1.5 square miles between Lake Michigan and the Milwaukee River, and took its present name in 1917, according to the Encyclopedia of Milwaukee. The Wisconsin Historical Society’s record for the Village Hall gives the pace that followed: 2,650 residents in 1920 and 13,479 by 1930, when the village had filled 95% of its land. In the 1920s, the encyclopedia adds, as many as 200 homes went up a year, some designed by architects such as Alexander Eschweiler and Russell Barr Williamson.

The village’s 2011 architectural survey, prepared by Carol Lohry Cartwright for the Wisconsin Historical Society and the village, describes the result: mostly single-family houses in the popular styles of about 1910 to 1940, few vernacular buildings, duplexes built to suggest single-family homes and apartment buildings meant as luxury housing. It places Shorewood’s distinction less in individual landmarks than in whole streets of Period Revival, Prairie, Craftsman and Bungalow houses, well kept and largely intact. The zoning code even gives the Estabrook Homes, Colonial Revival apartments built for young veterans’ families from 1947 to 1949, a residence district of their own (R-8).

Materials

Stucco, half-timber, lannon stone and clapboard

The survey’s architecture chapter reads like a list of what a painter meets here. Tudor Revival houses carry ornamental half-timbering, boards applied over stucco or other materials to suggest an English timber frame, often above a brick or stone lower story. Wide clapboard siding became pervasive from the 1930s into the 1950s, especially on houses with colonial details. Stone veneer dressed large revival houses early in the century and became very popular on small houses at mid-century, much of it limestone from around Lannon, Wisconsin, called lannon stone, and the small apartment houses built along North Wilson Drive from 1943 to 1947 have stone veneer exteriors.

So one house can carry three or four different surfaces. The applied half-timber boards are wood and are scraped, primed and painted like trim, keeping the edge where they meet the stucco clean. Stucco that has been painted before is washed, patched where it has cracked and recoated with a breathable masonry paint; stucco, brick or stone that has never been painted is usually best left that way, and we will say so at the estimate. The survey credits the village’s historic feel to a high quality of upkeep, with much less inappropriate remodeling than elsewhere in metropolitan Milwaukee, which is a fair argument for repairing original wood trim instead of covering it.

Homes built before 1978

Lead-safe rules for homes built before 1978

Wisconsin’s Lead-Safe Renovation Rule applies to a home or property built before 1978 when the work will disturb more than 20 square feet of painted surface outside, more than 6 square feet of painted surface per room inside, replace windows, or involve demolition. That work must be done by a certified Lead-Safe Renovator working for a certified lead company. The Wisconsin Department of Health Services publishes a list of certified companies, updated monthly, so you can check any contractor.

Historic properties

On the National Register? Shorewood adds a village permit

Shorewood has no historic preservation commission: none appears among the village’s boards and committees, and the 2011 survey recommended creating one. The Shorewood Historical Society points to the survey’s conclusion that as many as eight neighborhoods could qualify for historic district consideration, and says it is working with village trustees, staff and residents on preservation policies.

Read moreShow less

What the village does have is a building-code rule for listed buildings. Under §225-4, a historic property is any building in the village listed in the National Register or the State Register of Historic Places, and no addition, alteration or modification to one that the Building Inspector does not deem a minor repair may be undertaken without a historic property permit.

The application includes plans showing how the work will preserve the building’s historic and architectural character, and the Building Inspector approves it if the work will not adversely affect, detrimentally change or destroy historically or architecturally significant external features (§225-4B(3), (4)). The code does not say whether a repaint is a minor repair; that is the Building Inspector’s call, so on a listed building, ask Planning & Development (414-847-2640) before exterior work, and above all before stripping paint or changing colors. This goes further than federal law: the National Park Service says listing by itself places no restrictions on a private owner unless federal funding or a federal permit is involved, but the village’s code attaches a permit to it. The City of Milwaukee, to the south, works through a commission and city historic districts instead (our Milwaukee page).

The survey lists the village’s National Register properties at the time: the Village Hall (listed in 1984), the Kilbourntown House in Estabrook Park, and five houses built to Ernest Flagg’s stone masonry system, on N. Maryland Ave., E. Menlo Blvd., E. Olive St., N. Prospect Ave. and N. Summit Ave. The 1985 intensive survey form for one of them, the Erwin Cords House on E. Olive Street, describes a limestone exterior. If you are unsure of your house’s status, its record in the Wisconsin Historical Society’s Architecture and History Inventory shows it, and owners of listed homes may qualify for a state tax credit on exterior painting (our Whitefish Bay page sets out the rules).

Design review

The Design Review Board and a change of color

Shorewood’s Design Review Board has nine members, all residents, among them at least two architects and a real estate broker (§16-19). The village’s architectural and site review page describes its reach broadly: any improvement project that changes the exterior of a building, commercial or residential, requires the Board’s approval. The zoning code is narrower. Design review applies to new buildings, additions and exterior building modifications that require a permit under chapter 225, and to a short list of other items (§535-31C(2)); the Board’s own page adds that fences and same-size replacement windows need a building permit but not design approval.

Painting is not on the village’s permit information sheet, which says it is not all-inclusive; the sheet does list siding replacement, fences, decks, front steps and exterior remodeling, the last marked as possibly needing Board approval. Going by the code’s wording, a repaint in a house’s existing colors should not need design review. For a change of color on a prominent house, or a job that grows into new siding or trim, ask Planning & Development first. The Board meets at 5:00 p.m. on the second and fourth Thursdays (first and third in November and December), applications are due 10 days before a meeting, the residential design review fee is $75, and work begun without a required permit can bring triple permit fees.

On Capitol Drive and Oakland Avenue, the village’s Central District design guidelines (October 2006), written for development in that district, include a color standard: colors compatible with the area’s character, neutral and natural earth tones where possible with contrasting secondary or accent colors, and primary, bright or excessively brilliant colors discouraged except as sparing trim accents. Storefronts in one building should share compatible colors rather than one per shop. The village still links the guidelines from its review page; if your building is on those streets, ask whether they apply before choosing a scheme.

Work hours

Weekday work hours and dumpster permits

Shorewood’s noise chapter counts the erection, demolition, alteration or repair of any building outside 7:00 a.m. to 6:00 p.m. on weekdays among the noises it declares unreasonable, except in an emergency or with the Building Inspector’s permission (§383-2J). It does not say whether painting counts as repair, so we schedule pressure washing, sanding and other noisy prep within those weekday hours and ask before planning a Saturday.

A dumpster or temporary storage unit on private property needs a written permit from Planning & Development: no more than one of each per property, at least five feet from property lines and from the building, in the back yard where possible, for up to 40 days (§225-11). In the street, the permit information sheet calls for a permit to obstruct the public right-of-way.

Upkeep and fences

The housing code, fences and a voluntary inspection

The housing and property standards chapter asks owners to protect every exterior surface that can rot, decay or turn unsightly with weather with an approved covering applied in a workmanlike manner, and to keep it in reasonably good repair so the building does not hurt the look of its own or neighboring property (§326-6E). Painted or stained wood, brick, stone, vinyl, aluminum and stucco are among the approved coverings, and every fence must be kept in good repair or removed (§326-9A).

Under §225-8, a fence 16 linear feet or longer, or taller than four feet, needs a building permit; its structural side must face the owner’s own property, which puts the finished face toward the neighbor; and chain link is prohibited except knuckled chain link in side and rear yards. Restaining an existing fence is not on the permit sheet. Because the finished face looks out, staining it means working from next door, so please arrange it with your neighbor before the job is booked. Our fence painting and staining notes cover the prep.

Selling? From 1980 the village required a code compliance inspection at the time of sale; state budget language in July 2015 ended that, and the village now offers voluntary inspections: $50 for a single-family house, $65 for a duplex and $35 for a condominium. The checklist includes missing or defective siding, fascia, soffit and trim, porch supports, gutters, downspouts and fences, several of them parts of the house that exterior paint prep looks at closely.

Weather

Rain and cold nights between the lake and the river

NOAA’s 1991–2020 normals include a precipitation station named for the village, Shorewood 0.6 NW, about half a mile northwest of its center. Its normals make June the wettest month, at 5.03 inches, and count the days with at least a tenth of an inch of rain: 7.6 in May, 8.6 in June, 6.0 in July, 6.3 in August and in September, and 6.5 in October. From May through October, days with any measurable precipitation run from 10.4 in September to 13.5 in June. The day counts rest on about 14 years of data, and NOAA labels them provisional.

Its normals cover precipitation only. The nearest station with temperature normals is Mt Mary College, about 7 miles west; Milwaukee Mitchell Airport, about 9.5 miles south, sits closer to the lake. Their median season free of 36°F nights runs 150 and 168 days, and our Whitefish Bay weather notes set their dates side by side. NOAA’s narrative for Milwaukee adds that in spring and early summer an easterly wind can drop temperatures 10 to 20 degrees, an effect a light breeze carries only a mile or two inland. In a village between the lake and the river, a sunny May forecast for the metro area can still mean a cool afternoon on the block.

With standard latex, plan exterior work for June through August, with June’s rain in mind; September usually works with a paint rated for cooler nights, and May and early October lean on such a paint and the forecast (how eight stations compare).

Shorewood painting questions

Do I need Design Review Board approval to repaint my house in Shorewood?

Painting is not on the village’s permit information sheet (which says it is not all-inclusive), and the zoning code applies design review to new buildings, additions and exterior building modifications that require a permit (§535-31C(2)). The village’s architectural review page describes the Board’s reach more broadly, as any improvement that changes a building’s exterior. Before a change of color, or if the job grows into replacing siding or trim, ask Planning & Development at 414-847-2640.

My Shorewood house is on the National Register. Does that affect painting?

It can. Under §225-4 of the village code, no addition, alteration or modification to a building listed in the National or State Register that the Building Inspector does not deem a minor repair may be done without a historic property permit, which is approved if the work will not harm the building’s historically or architecturally significant external features. Ask the Building Inspector whether your repaint counts as a minor repair before work begins, especially if paint will be stripped or colors changed.

Does Shorewood have village historic districts or a preservation commission?

We found neither. The village’s boards and committees include no historic preservation commission, and we found no village historic districts. The 2011 architectural survey found that most of the village’s significant historic buildings could be included in very large potential National Register historic districts, and it recommended a commission; the Shorewood Historical Society says it is working with village trustees, staff and residents on preservation policies.

What hours can painters work in Shorewood?

The noise chapter declares the erection, demolition, alteration or repair of any building outside 7:00 a.m. to 6:00 p.m. on weekdays unreasonable noise, unless the Building Inspector grants an exception (§383-2J). It does not say whether painting counts, so we keep noisy prep such as pressure washing and sanding to those weekday hours.

Does Shorewood require me to keep my house painted?

The housing code requires exterior surfaces that can rot, decay or become unsightly from the weather to be protected by an approved covering, such as painted or stained wood, brick, stone, vinyl, aluminum or stucco, and kept in reasonably good repair (§326-6E). Fences must be kept in good repair or removed (§326-9A).

How it works

What to expect, from first call to final walkthrough

  1. Free, no-pressure estimate

    An honest look at your home.

  2. Clear written quote

    A straightforward, honest scope.

  3. Thorough prep

    Wash, scrape, sand, repair, caulk, and prime.

Greater Milwaukee

  • Milwaukee
  • Wauwatosa
  • West Allis
  • Whitefish Bay
  • Shorewood
  • Mequon
  • Bay View
  • Greenfield
  • Franklin

Sources

Where the facts on this page come from

U.S. Census Bureau (tables B25003, B25024, B25034, B25035, B25036): American Community Survey 2020–2024 housing tables, read October 23, 2026.

U.S. Census Bureau: 2024 Gazetteer, Wisconsin places, read October 23, 2026.

Encyclopedia of Milwaukee (University of Wisconsin–Milwaukee), entry on Shorewood: Village history, read October 23, 2026.

Wisconsin Historical Society, National Register record NR1966: Village Hall, 3930 N. Murray Ave., read October 23, 2026.

Read moreShow less

Carol Lohry Cartwright for the Wisconsin Historical Society and the Village of Shorewood, 2011: Architectural survey report (PDF), read October 23, 2026.

National Park Service NPGallery (Wisconsin intensive survey form, May 27, 1985): Erwin Cords House survey form (PDF), read October 23, 2026.

Shorewood Historical Society: Historic preservation, read October 23, 2026.

Village of Shorewood Code (eCode360), chapter 225, article I: §225-4, historic properties, read October 23, 2026.

Village of Shorewood Code, chapter 225, article II: §225-8 fences and §225-11 temporary dumpsters, read October 23, 2026.

Village of Shorewood Code, chapter 326: Housing and property standards, read October 23, 2026.

Village of Shorewood Code, chapter 383: Noise, read October 23, 2026.

Village of Shorewood Code, chapter 535, article IV: Zoning districts (§535-17), read October 23, 2026.

Village of Shorewood Code, chapter 535, article VI: Review procedures (§535-31), read October 23, 2026.

Village of Shorewood Code, chapter 16, article VIII: Design Review Board (§16-19), read October 23, 2026.

Village of Shorewood: Design Review Board, read October 23, 2026.

Village of Shorewood, Planning & Development: Architectural and site review, read October 23, 2026.

Village of Shorewood, Planning & Development: Building, trade and other permits, read October 23, 2026.

Village of Shorewood, Planning & Development: Permit information sheet (PDF), read October 23, 2026.

Village of Shorewood, Planning & Development: Residential development application (PDF), read October 23, 2026.

Village of Shorewood: Boards and committees, read October 23, 2026.

Village of Shorewood, Planning & Development: Code enforcement and compliance, read October 23, 2026.

Village of Shorewood, Planning & Development: Voluntary code compliance inspection brochure (PDF), read October 23, 2026.

Village of Shorewood, Planning & Development: Voluntary home inspection application (PDF), read October 23, 2026.

Village of Shorewood (The Lakota Group), October 17, 2006: Central District design guidelines (PDF), read October 23, 2026.

Wisconsin Historical Society: Homeowner historic tax credit, read October 23, 2026.

National Park Service: National Register of Historic Places FAQ, read October 23, 2026.

NOAA National Centers for Environmental Information (station US1WIMW0001): U.S. Climate Normals 1991–2020, precipitation (monthly), read October 23, 2026.

NOAA National Centers for Environmental Information (stations USC00475474 and USW00014839): U.S. Climate Normals 1991–2020 (annual), read October 23, 2026.

NOAA National Centers for Environmental Information: Station inventory with coordinates, read October 23, 2026.

NOAA climate narrative for Milwaukee Mitchell Airport (NCDC station page, archived by UW–Madison Atmospheric and Oceanic Sciences): Station history and climate summary, read October 23, 2026.

Wisconsin Department of Health Services: How to hire a lead-safe contractor, read October 18, 2026.

Census figures are survey estimates with margins of error. City rules change, so check with the office named above before you plan exterior work.

Wisconsin · Google reviews

Tyler Cooper

October 2026

Great team they have, and great quality of work. Family owned company that gets the job done correctly. :)

Google review · Wisconsin

Patryk Pogorzelski

October 2026

Amazing work very professional would definitely hire them again!

Google review · Wisconsin

Read our Wisconsin reviews on Google

Painting in Shorewood, done properly.

Tell us about your project and we’ll call or email to set a time.